陽光房是提供大家享受自然的地方。要搭成一個陽光房,選擇材料是比較重要的?,F在許多裝修公司都會采用防腐木的陽光房。那么防腐木陽光房的安裝有哪些需要注意的事項呢?下面小編給大家介紹下。
Sunshine room is a place for everyone to enjoy nature. To build a sunlight room, it is important to choose materials. Now many decoration companies will use antiseptic wood sunlight room. So what should be paid attention to in the installation of anticorrosive wood sunlight room? Now I'll introduce you to Xiaobian.
1、木結構基層的處理:設計施工中應充分保持防腐木材與地面之間的空氣流通,可以更有效延長木結構基層的壽命。
1. Treatment of wood structure base: the air circulation between anticorrosive wood and the ground shall be fully maintained in the design and construction, so as to extend the service life of wood structure base more effectively.
2、制作安裝防腐木時,防腐木之間需留0.2-1CM的縫隙可避免雨天積水及防腐木的膨脹。
2. When making and installing anticorrosive wood, a gap of 0.2-1cm shall be left between the anticorrosive wood to avoid water accumulation in rainy days and expansion of anticorrosive wood.
3、厚度大于50mm或者大于90mm的方柱為減少開裂可在背面中心位置開一道槽。
3. For square columns with thickness greater than 50mm or 90mm, a groove can be opened at the back center to reduce cracking.
4、五金件應用不銹鋼、熱鍍鋅或銅制的(主要避免日后生銹腐蝕,并影響連接牢度)連接安裝時請預先鉆孔,以避免防腐木開裂。
4. The hardware shall be made of stainless steel, hot-dip galvanized or copper (mainly to avoid future rust corrosion and affect the connection fastness). When connecting and installing, please drill holes in advance to avoid cracking of anti-corrosion wood.

5、盡可能使用現有尺寸及形狀,加工破損部分應涂刷防腐劑和戶外防護涂料;因防腐木本身是半成品,毛糙部分可在鋪完后等木材含水率降到20%以下,再砂光一遍,如想有更好的效果,表面清理干凈后亦可涂刷戶外防護涂料。如遇陰雨天,可以先用塑料布蓋住,等天晴后再刷戶外保護涂料。涂刷后24小時之內應避免雨水。
5. The existing size and shape shall be used as much as possible, and the damaged part shall be coated with preservative and outdoor protective coating; because the anticorrosive wood itself is a semi-finished product, the rough part can be sanded again after the moisture content of the wood is reduced to less than 20% after paving, and the outdoor protective coating can be painted after the surface is cleaned for better effect. In case of rainy days, you can cover it with plastic cloth first, and then brush the outdoor protective coating after the weather is clear. Rain shall be avoided within 24 hours after painting.
6、表面用戶外防護涂料或油基類涂料涂刷完后為了達到較佳效果,48小時內避免人員走動或重物移動,以免破壞防腐木面層已形成的保護膜。如想取得更優異的防臟效果,必要時面層再做兩道專用戶外清漆處理。
6. After the surface is painted with outdoor protective coating or oil-based coating, in order to achieve better effect, avoid personnel walking or heavy objects moving within 48 hours, so as to avoid damaging the protective film formed on the anti-corrosion wood surface. If you want to achieve better anti fouling effect, if necessary, the surface layer should be treated with two coats of special outdoor varnish.
以上就是關于防腐木陽光房安裝時需要注意的事項,希望可以幫助到大家。
The above is about the anticorrosive wood sunlight room installation need to pay attention to the matters, I hope to help you.